A high-end hotel in the leisure sector faced a critical chiller failure during peak summer demand. With hundreds of guests expecting cool, comfortable rooms and the site running 24/7, downtime was simply not an option.
Ideal Heat Solutions was tasked with mobilising and installing a temporary cooling solution immediately — ensuring seamless guest comfort, preventing financial losses from compensation claims, and keeping the hotel fully operational.
We acted quickly and methodically to deliver the right solution under tight time pressures.
– EMERGENCY CALL-OUT
The call came in at 8pm on a Friday evening. By 9am the next morning, our engineers were on-site, ready to begin hose runs and system setup. Despite transport challenges caused by “Truck Fest” limiting driver availability, we secured haulage and mobilised equipment overnight.
– EQUIPMENT DELIVERY
A 400kW Trane chiller was dispatched with 120m of 4” steel braided hose loaded into our vans to start the run immediately.
– INSTALLATION & SETUP
The chiller was landed in a designated external area. Our team completed a complex 60m high-level hose run dropping into the plant room to connect with existing DN100/PN16 connections. By working side by side with the client’s contractors, the system was installed and powered up the same day.
– SYSTEM DESIGN & OPERATION
The chiller was connected seamlessly to the existing hotel system, supplying chilled water directly to maintain guestroom temperatures across the property. By 5pm Saturday, the system was online, delivering immediate cooling.
– ON-SITE SUPPORT & COLLABORATION
Our engineers stayed late into the evening, checking temperatures across the hotel to ensure the solution was performing. In a true spirit of teamwork, they even arranged food for all contractors after a long day — keeping morale high and the operation running smoothly.
– COMPETITIVE ADVANTAGE
While rival suppliers couldn’t respond until Monday, Ideal Heat Solutions had the system operational within 24 hours — a full 48 hours faster than the competition.
All equipment was selected for fast deployment, reliability, and high-capacity performance:
Provide a quick cooling solution for a 24/7 luxury hotel, preventing downtime, guest complaints, and financial loss — all during peak summer demand.
Delivered and installed a 400kW emergency chiller within 24 hours of the call, including a complex hose run and full integration with the existing plant.
Hotel operations continued seamlessly — no disruption to guests, thousands were saved by avoiding compensation claims and the install was completed 48 hours faster than competitors.
The client praised the smooth, professional teamwork and left a glowing review.
Ideal Heat Solutions provides fast, scalable cooling solutions for hotels, leisure venues, and the hospitality sector. Our engineers deliver everything from emergency mobilisation and installation to remote monitoring and on-site support — ensuring your operations stay cool, efficient, and stress-free.